Technology Upgrade Programmes
· Development of advanced design validation test rig with the following capabilities:
- Seal face endurance testing (hot & cold coolant cycle test)
- Pump performance test from -40C to 120C (Edge case testing)
· Installation of automated assembly setup with individual load cells, LVDT for force curves and IoT capability to analyse reports
· Installation of 10 station automated oil pump assembly setup with attached performance test rig
· Development of oil pump test rig for endurance performance inclusive of 23% oil foam by volume